1. EQUIPMENT AND TOOLS REQUIR

⏩Gloves, protective mask and goggles ⏩Brush, abrasive paper and cutter ⏩Spatula, mastic knife ⏩Paintbrushes, roller ⏩Gas burner ⏩Adhesive roller

2. PIPES WITH A BIOZINALIUM AND ZINALIUM EXTERNAL COATING: Natural, Integral, Blutop, Topaz, Tag 32

2. PIPES WITH A BIOZINALIUM AND ZINALIUM EXTERNAL COATING: Natural, Integral, Blutop, Topaz, Tag 32

⏩Brush to remove any dirt or loose particles. ⏩Dry the surfaces to be coated (in case of low  temperatures or high humidity, use a gas  burner). ⏩If the iron is exposed, apply high-zinc  anticorrosion primer NATZINC (ref. 251222)  with a paintbrush with vertical and horizontal  strokes. ⏩Allow to dry for a few minutes. ⏩Apply AQUACOAT paint with a paintbrush  (NATURAL/BLUTOP Blue ref. 240991 –INTEGRAL/TAG32/TOPAZ Red ref. 240990)  with vertical and horizontal strokes.

3. FITTINGS WITH AN EPOXY EXTERNAL COATING: Natural, Blutop, Integral, Topaz (all versions).

3. FITTINGS WITH AN EPOXY EXTERNAL COATING: Natural, Blutop, Integral, Topaz (all versions).

⏩Brush and clean the area to be touched up and  then dry. ⏩Apply the epoxy paint with a paintbrush or  spatula with vertical and horizontal strokes. ⏩Natural / Blutop: EUROKOTE 4820 Blue  (1 kg dose: ref. 158255) ⏩Integral / Tag32 / Topaz: EUROKOTE 4820  Red Brown (1 kg dose: 184653 or kit of five  50 ml syringes: ref. 220817) ⏩•Standard TT PUX and Integral TT PUX: Eurokote 4820 Ivory (ref. 220818)

4. PIPES WITH A ZINC AND SYNTHETIC PAINT EXTERNAL COATING

4. PIPES WITH A ZINC AND SYNTHETIC PAINT EXTERNAL COATING

⏩Brush to remove any dirt or loose particles. ⏩Dry the surfaces to be coated (in case of low  temperatures or high humidity, use a gas  burner). ⏩If the iron is exposed, apply high-zinc  anticorrosion primer NATZINC (ref. 251222)  with a paintbrush with vertical and horizontal  strokes. ⏩Allow to dry for a few minutes. ⏩Allow to dry for a few minutes.

5. PIPES WITH A POLYETHYLENE EXTERNAL COATING

⏩5.1 Significant damage ⏩Roughen the area to be repaired with abrasive  paper. ⏩Clean and dry the area. ⏩Preheat to approximately 60°C. ⏩Fit an open heat-shrink sleeve (reference on  request) ⏩Wrap the sleeve all around the pipe's  circumference using a gas burner and then fit  the closing strip.

5. PIPES WITH A POLYETHYLENE EXTERNAL COATING

5. PIPES WITH A POLYETHYLENE EXTERNAL COATING

⏩5.2 Significant damage ⏩Repair kit ref. 111216 comprising abrasive  paper, mastic and a repair strip. ⏩Clean and dry the exposed area. ⏩Cut off and remove the damaged PE. ⏩Preheat to approximately 60°C.  ⏩Apply the mastic and smooth with a knife.  ⏩Place the repair strip with a 50mm overlap on  the edges of the cut area. ⏩Heat the strip with a gas burner until the heatsensitive paint changes color. ⏩Press the strip down wearing appropriate  gloves. 5.3 Minor damage In case of minor damage to the TT coating, use the PE repair stick (ref.  175507). Using a brazing torch, heat the stick until it drips onto the damaged  area and then smooth over.

5. PIPES WITH A POLYETHYLENE EXTERNAL COATING

6. PIPES WITH A POLYURETHANE EXTERNAL COATING

⏩Brush to remove any dirt or loose particles and  then sand to clean and roughen the surface. ⏩Remove any dust from the surface to be coated.strip. ⏩Heat with a gas burner to remove any traces of  humidity. ⏩Apply the product to the surface with a syringe  (kit of five syringes - Eurokote 4820 Ivory –ref.  220818).. ⏩Cover with a sheet of PVC to smooth out and  protect the product.  Close with adhesive.

6. PIPES WITH A POLYURETHANE EXTERNAL COATING

7. PIPES WITH A CEMENT EXTERNAL COATING

⏩Prepare the affected surface by removing the  damaged and loose mortar. ⏩Brush to remove any dirt or loose particles and  then clean the surface. ⏩Prepare the ZMU repair kit (DN 80 to 600: ref.  218842). •Mix the dry components •Add the liquid while stirring vigorously •Leave for five minutes and then mix again ⏩Dampen the surface. ⏩Fill with mortar using a spatula and then  smooth the surface. (DN≥ 700: ref. 158009) ⏩Prepare the SIKADUR 31DW mixture with three parts R (resin) and one part H  (hardener). Mix to an even consistency. Preferably position the area to be repaired facing downwards. ⏩Remove any damaged and loose mortar. Clean until spotless. Apply the mixture and compact to ensure the correct thickness. Smooth the surface. ⏩Minimum application temperature: + 5°C. Cover with plastic film or a damp cloth to  maintain a high level of humidity and ensure  that the mixture sets properly. Optimal drying time: 2 hr 30 min

7. PIPES WITH A CEMENT EXTERNAL COATING